replaced pcb board and 3 way motor valve today still the same. fully drained down expanssion vessel pumped it up to 3/4 bar as it had no air in it. refilled system still the same,3 radiators not working now. boiler working better now but still pressure gets to 3 bar, takes 1 hour instead of 4 mins to get to 3 bar
now have no hair, any other ideas or suggestions thanks
mick fells
December 2006