close the filling loop under the boiler.two valves attatched to a braided hose.close both valves either with nobs horizontal or if screw type use a slot screwdriver and turn horizontal accross pipe to close.if pressure stil too high drain some out of one of the rads
deano
November 2010
Automatic Answer
We may have found other answers which could help you.