you should have been supplied with a filling loop (braided 15mm hose with a quarter turn valve and a check valve. it is normally left fitted. it will be connected from the mains cold (somewhere downstream of the black knob) and teed into one of the 22 or 28mm pipes running up into the boiler.
turn this on until you get 1.5bar then you will need to check for leaks, bleed the system while topping up the pressure, fire it up, bleed again and keep looking for the leak. it is a sealed system so either the overpressure valve the goes outside is leaking or you are leaking somewhere less obvious. when u find it and fix it, add a bottle of inhibitor to protect the system
bubblehead
January 2010