You don't say what size cable, or what type was used for the main earth, supplementary earth bonding.
Regardless to whatever a test meter will tell you, the regulations are very clear as to minimum cable sizes for these earth points (as you put it).
It could well be that he didn't bother to put a meter on them, as quite often a visual inspection is enough to determine that the cable, and possibly the terminations are inadequate.
Paul
December 2009