After refitting rad and opening rad valves,rad will need to be vented through vent screw at the end up top or the rear.system pressure will drop.open filling loop,located under boiler or in hot press,recognisable by flexible hose,refill system to 1 or 1.5 bar.
Impressive heating
July 2007