remove the top lid.undo the 2 8mm screw in the back holding the top on and then push the top backwards hard to release it.blue wiring loom goes from the main pcb on the right side panel in to the front control panel pcb.it is usually the control panel pcb that needs edge connection cleaning and the blue loom connection pins tweaking carefully to make a good contact
ck
January 2011