you use the filling loop and re-pressure the system back up to around the 1 to 1.5 bar mark on the gauge, then turn off the water top the filler loop, bleed any air out out of the rads, check if the system needs re pressuring, then you disconnect the filler loop to comply with bylaws
wirecutterman
December 2009