Hiya
If you are fitting the on-board digital programmer:
Yes, you will need a link between LS and LR if there is not one fitted. These are mains voltage connections, please isolate the boiler electrically and do take care.
You can access these connections by taking the long narrow strip off the bottom of the grey part of the fascia.
If you are fitting an external programmer that wires back to LS and LR, that should do away with the need for the link.
Bunslinger
March 2009