think we need a bit more sequence of operation to try work out whats messed up.
ie dhw demand typical
open hot tap
front pin comes out makes switch (tap led on)
top pin rises makes switch proving pump is running
sequence continues through fan, aps, ignition.
hot water demand, both micro switches are made.
ch demand, only top micro switch is made
talk through sequence
iain
May 2008