There will be a filling loop usually close to the boiler it is a chrome plated flexible pipe about 300m long that "loops" from one pipe to another close by,it is usually already connected to the 2 pipes,there is a black tap on each end turn both on until pressure rises to 1.5 bar. turn both off when pressure achieved,job done
toptrish
December 2013