1, remove calliper and pad carrier.
2, remove hubnut
3, remove 6 T50 trox bolts
4, but hub and disc in press and apply 11.75 tons of force and wait for the loud bang as they split.
5, apply lube to faces and line new disc up
6, start torx bolts by hand and evenly tighten them up so it pills the disc on straight
box up job done.
45 mins per side
Reg
January 2011