underneath boiler there should be flexi silver pipe at one or both ends there is a tap with either a black lever or a slot for a screwdriver sorry can't be more specific but generally speaking if the slot/lever is at right angles to the pipe it's off in line it's on you want it /them to be on to fill
brian
December 2010